Projected Timeline:

Goals for the Coming Weeks

This is my projected timeline from the third week into the project.

Week 3 (begins 2/4/07)Add this timeline to the website. Implement the first simple data save system of a delineated text file. Start adding more features for identifying face to the interface.
Week 4 (begins 2/11/07) Begin working on search algorithm. Load the picture not only on the screen, but also load the bytes describing the picture into a bitmap or some structure. Also, picture loading should be done with the typical browse of files rather than typing the file name in manually. Improve website look.
Week 5 (begins 2/18/07) Improve interface. Continue working on search and the display of the search results.
Week 6 (begins 2/25/07) Keep improving search, interface, and matching characteristics used.
Week 7 (begins 2/4/07) Continue improving, working on features, search.
Week 8 (begins 2/11/07) Give Walkthrough of the project so far. Continue working on search, identification of features.
Week of Spring Break (begins 3/18/07) Spring Break Vacation Week
Week 9 (begins 3/25/07) Working on project.
Week 10 (begins 4/1/07) Working on project.
Week 11 (begins 4/8/07) Project should be on the way to nearly done.
Week 12 (begins4/15/07)Finish up project. It should look nice, be understandle to use, identify possible matches of faces. Some features may be detected by the program. Make an abstract for the presentation.
Week 13 (begins 4/22/07)Be prepared for presentation. Put finishing touches on website.
Week 14 (begins 4/29/07) Be prepared for defense.
Week 15 Final Documentation.